Test panel and removed swim platform
I chopped 1.5 oz on both sides of a test panel of Airex T90. Its pretty strong and light. I was thinking about vacuum bagging, but it would be a lot faster to chop.
http://i722.photobucket.com/albums/w...psbd8504b4.jpg
I also removed my swim platform to get access to the transom boards. I plan on moving the outer brackets closer to make room for an actuator for a surf tab.
http://i722.photobucket.com/albums/w...ps84534e91.jpg
http://i722.photobucket.com/albums/w...ps6246fa12.jpg
Replacing Transom Boards with Coosa
I had one dull sounding spot on the portside outboard bottom corner. I am replacing them with 2" Coosa board and cut it to shape. I made them a little bigger to accommodate the moving of the swim platform brackets. All others were solid. I am going to go ahead and replace the starboard side even it was solid. I am keeping the top ones original. I have still have quite a bit of grinding to do before the mount and glass these in.
http://i722.photobucket.com/albums/w...ps916e130f.jpg
http://i722.photobucket.com/albums/w...ps8c91ee96.jpg
http://i722.photobucket.com/albums/w...psa007a4e0.jpg
http://i722.photobucket.com/albums/w...psbce2f7bd.jpg