A little more progress now that it's started warming up here and there.
https://i.imgur.com/11C5Kjg.jpg
https://i.imgur.com/nbKkTTA.jpg
installed drainage at key locations with PVC epoxied through the stringers
https://i.imgur.com/Ojt6nOE.jpg
I've got just a lttle prep work left and then I'll be ready to paint the bilge and glass in the deck. Won't be long now. (hopefully)