Glassing stringers.
Type: Posts; User: Gaducker
Glassing stringers.
All the stringers and cross braces laid out.
Those vents just go back into the middle of the big stringers?
Mine had a 90 and a hose for the cooler drain.
Outer 1x6 stringers in.
Almost empty.
Took us a good 2 weeks to get it cleaned out and stripped down to nothing.
We have already finished with the floor and we sat the deck back on yesterday.
1000 bucks with a spare engine and drive. I could find 500 dollar projects with enclosed bow but he wanted a bow rider and we could not find a bow rider for cheap.
This floor was completley rotten, has anyone got any pics of the holes in the deck where the wires and cables from the wheel go under the deck and into the center engine compartment?
Total tear out started.
As we discussed a total tear out.
Pre split before I commited to pulling the floor up.
Project boat for my son. Started on it June 1st.
Anybody? Anybody got experince?
I am rebuilding a 87 supra and the cable was froze. Anyone install manual hydraulic sterring? I'm thinking it's got to be better than a cable.