Thanks Zim
Thanks Zim
Stéphane
-----------------------
1989 Supra Saltare
Installing clamps and clamp supports :
Stéphane
-----------------------
1989 Supra Saltare
Fleece in place, Resin is for monday :
Stéphane
-----------------------
1989 Supra Saltare
Resin is dry Inside/outside, built the filter, add some house sealing stuff Inside to get more rear absorbtion, mounting the filter, and close the box with speakers to do a first test :
Stéphane
-----------------------
1989 Supra Saltare
Video of the first test is coming
Stéphane
-----------------------
1989 Supra Saltare
First notes of the HLCD new tower speaker box :
Stéphane
-----------------------
1989 Supra Saltare
Hey guys, is there a way to add "HLCD page 3" to the title of this thread ?
Stéphane
-----------------------
1989 Supra Saltare
Vinyl in place :
It should be on the boat this weekend
Stéphane
-----------------------
1989 Supra Saltare
Thanks Marvin
Here we are, the new tower speaker box HLCD is finished. Next step is mounting on the boat.
It looks good with brushed aluminium face, don't know if I will polish it this winter. Let's see how it looks on the boat now.
Stéphane
-----------------------
1989 Supra Saltare