Page 5 of 10 FirstFirst ... 34567 ... LastLast
Results 41 to 50 of 91

Thread: Project Beast

  1. #41
    Join Date
    Sep 2014
    Location
    Lake St Clair, MI
    Posts
    272

    Default

    What type of tower is that? I really like it. Boat looks good!

  2. #42
    Join Date
    Oct 2012
    Location
    Apex, NC
    Posts
    170

    Default

    coming along nicely man! Great work

    John Young, Supra Launch 21V
    Apex, NC

  3. #43
    Join Date
    Jul 2013
    Location
    Knoxville
    Posts
    92

    Default

    Looks like the old supra project is about to start again. Life kinda stepped in the way of the boat project (selling our house, buying another house, and trying to adopt two children). However, progress should begin this coming week. Our original goal was for the boat to be completed by the supra reunion. That's not going to happen but we are now hoping to have the gel done by then and possibly the motor. Let the fun begin.
    Last edited by Southerngrounds; 05-27-2015 at 02:22 PM.
    85 Supra Sunsport project

  4. #44
    Join Date
    Oct 2012
    Location
    Guelph Ontario
    Posts
    528

    Default

    Was that "trying to adapt to children" or "trying to adopt twochildren?

    Either way, I share your pain regarding the house, we're moving into our new digs in 6 days, and I now have a heated shop in which I can work on a boat, problem is, no trailer, and nothing big enough to tow with.

    Good luck with the beast.
    Last edited by chris young; 05-27-2015 at 02:23 PM.

  5. #45
    Join Date
    Jul 2013
    Location
    Knoxville
    Posts
    92

    Default

    Quote Originally Posted by chris young View Post
    Was that "trying to adapt to children" or "trying to adopt twochildren?

    Either way, I share your pain regarding the house, we're moving into our new digs in 6 days, and I now have a heated shop in which I can work on a boat, problem is, no trailer, and nothing big enough to tow with.

    Good luck with the beast.
    We just taught our kids which "to,two,too" to use. You caught me
    85 Supra Sunsport project

  6. #46
    Join Date
    Jul 2013
    Location
    Knoxville
    Posts
    92

    Default

    Just a few more days and I should have some shop space. Out with the Malibu in with the Supra 01da87e93a6a9240eb7ff9184a136edba030c04335.jpg
    85 Supra Sunsport project

  7. #47
    Join Date
    May 2009
    Location
    Back to Dallas!
    Posts
    1,845

    Default

    Man I like that tower! What brand is it? Jet
    89' Comp rebuild thread:
    https://www.facebook.com/andrewjetm/...1923456&type=3

    89' Comp Mod's and fun pic's:
    https://www.facebook.com/andrewjetm/...6666464&type=3

    89' Supra/Custom Tower & Interior/Swivel Racks
    4 Blade-14X14/1600 lbs Ballast
    Roswell Bar/Led's/Krypt 6.5 HLCD's/Krypt 4200 Eq
    JL-Kicker Amps 2000 Watts/Kicker Interiors/L7 Kicker Sub

  8. #48
    Join Date
    Jul 2013
    Location
    Knoxville
    Posts
    92

    Default

    Quote Originally Posted by jet View Post
    Man I like that tower! What brand is it? Jet
    Monster MTK
    85 Supra Sunsport project

  9. #49
    Join Date
    May 2015
    Location
    Edmond, OK
    Posts
    12

    Default

    Looks great so far man,

    I am about to start the exact same project... any tips? How did you get the old stringers out? Mine are super rotted which i've heard makes it much easier to tear them out.

    How long did it take you to remove the old stuff and how long to get the new stringers in? Just wanna gauge how much time i will need.
    1986 Supra sun sport with 454

  10. #50
    Join Date
    Jul 2013
    Location
    Knoxville
    Posts
    92

    Default

    Quote Originally Posted by thepadokc View Post
    Looks great so far man,

    I am about to start the exact same project... any tips? How did you get the old stringers out? Mine are super rotted which i've heard makes it much easier to tear them out.

    How long did it take you to remove the old stuff and how long to get the new stringers in? Just wanna gauge how much time i will need.
    I took the easy way out and paid shanne at the boat works to do the stringers. After lots of research on here I decided the $2500 he charges for it isn't that bad. I uncapped it. He removed the floors, stringers, and foam. Then he installed the stringers and floors
    Last edited by Southerngrounds; 06-02-2015 at 01:30 PM.
    85 Supra Sunsport project

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •