Page 2 of 2 FirstFirst 12
Results 11 to 18 of 18
  1. #11

    Default

    Lower half mold is complete

    I hope to have the first one assembled by the weekend possibly. I plan to build a bottom half tomorrow now that the mold is prepped polished and ready for production.


    Sent from my iPhone using Tapatalk

  2. #12

    Default


    First one out. Needs the mold release washed off and a final trim. Otherwise Iím pretty happy with it!


    Sent from my iPhone using Tapatalk

  3. #13

    Default




    Today I glassed in some 1Ē HDPE for the mount bracket screws to bite into. This will be filled with two part closed cell foam once the top half is installed over it.


    Sent from my iPhone using Tapatalk

  4. #14

    Default





    First one is complete minus the padding on top. Iím waiting on the customer to let me know what color he wants.


    Sent from my iPhone using Tapatalk

  5. #15

    Default

    Quote Originally Posted by Turbinesurgeon View Post
    My boat is the same colors as yours


    Sent from my iPhone using Tapatalk
    Yes it sure is!


    Sent from my iPhone using Tapatalk

  6. #16
    Join Date
    May 2019
    Location
    Arizona
    Posts
    143

    Default

    Quote Originally Posted by Brian_289 View Post
    Yes it sure is!


    Sent from my iPhone using Tapatalk
    Regardless what your customer wants the color should be orange


    Sent from my iPhone using Tapatalk

  7. #17

    Default

    I thought about it for my own. But with the risers the platform wonít be lined up with the orange any more, it will be centered on the black part. So Iím thinking I make mine black..


    Sent from my iPhone using Tapatalk

  8. #18

    Default

    Well, after a long wait I finally got to see my platform installed and put to use.






    Sent from my iPhone using Tapatalk

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •