Results 1 to 10 of 59

Threaded View

  1. #18
    Join Date
    Dec 2013
    Posts
    645

    Default

    Alright, here are pics of the super pumps installed. I finally got the boat out for the first run of the season. Those are 1280# bags that fill in 8 minutes. Emptying takes about 9. They all checked out great, so now the rear line locker will go back in place over the top of the pumps. Of note are the large red 4 gage power cables feeding these thirsty pumps. When they kick in, you know it! I don't think there is much chance of accidentally turning these pumps on without knowing it. The first 2 pics show the hydraulic pumps for the wake plates. I still have some work to go on those to get them "tuned".





    Last edited by CJD; 03-20-2021 at 10:24 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •