Page 14 of 46 FirstFirst ... 4121314151624 ... LastLast
Results 131 to 140 of 457
  1. #131
    Join Date
    Jul 2011
    Location
    fort worth , tx
    Posts
    1,171

    Default

    how many layers did yall used to encapsulate the stringers ?

  2. #132
    Join Date
    Jul 2011
    Posts
    499

    Default

    i have heard 2 on outter and 3-4 on main?

  3. #133
    Join Date
    Feb 2009
    Location
    Edmond, OK
    Posts
    2,508

    Default

    As I mentioned before I exclusively used 1708 on the structural pieces. I put three layers on the main stringers and the engine mounting area, although the engine mounting area overlaps onto the stringer after it had been wrapped so there are areas of that stringer that are 5-6 layers thick right in there. I put two layers on the secondary stringers and tab plus a layer on the ribs. The ribs have most of them covered in 2 layers because of how I did the tabbing, but not 100%.

  4. #134
    Join Date
    Jul 2011
    Location
    fort worth , tx
    Posts
    1,171

    Default

    ok well i tabbed them to the hull with 1 layer csm and 1 1708 , how much sanding do i need to do some more lay ups of 1708 ? cause what i plan to do is build the other side ... get the floor height , cut to floor height , and cap the stringers with 1708 and 10oz wovin rovin ... ? any thoughts ?

  5. #135
    Join Date
    Aug 2009
    Location
    NW Houston
    Posts
    1,330

    Default

    Between layers - sand just enough to take the ridges & high spots off so the next layer will lay down smooth without bubbles. Also you want to rough up everything to take the sheen off the previous resin & wipe down with solvent to help get a good bond. Extend each successive layer ~1/2" beyond the previous edge to get a smooth transition.
    _______________89 Saltare Resto Project___________
    _________Then________________________Now_____

  6. #136
    Join Date
    Jul 2011
    Location
    fort worth , tx
    Posts
    1,171

    Default

    Thanks Mike - That clears up my thoughts on layups ... I ran out of resin so im waiting for my local store to get there fresh stock in .... be looking for more pics !

  7. #137
    Join Date
    Jul 2011
    Posts
    499

    Default

    let see some pics of that fiberglass work lively!

  8. #138
    Join Date
    Jul 2011
    Location
    fort worth , tx
    Posts
    1,171

    Default

    HA ha ... ill be home this weekend and ill take some pics

    So i got me a 80 gal single stage compressor for 130.00 off Craigslist and im rebuilding the pump this weekend , Its been rainy all week here and is deff a good thing cause are lakes need it !!

    With that said , I plan to mark my new stringer for absolute deck height , then cut the other side out and start some more grinding .. I think im going to wait on cutting the deck lip out .. until i know for sure where i need to be , I have got till the 1st of December to get the floor finished and sealed ,, ( my goal ) and I have ordered another 5 gal of poly for the other side ... but at-least ill know what im doing now lol ....
    Last edited by lively; 10-12-2011 at 04:41 PM.

  9. #139
    Join Date
    Jul 2011
    Location
    fort worth , tx
    Posts
    1,171

    Default

    here is just a small shot of the 2 layers of tabbing I did , I'm cutting out and grinding the other side this weekend and I'll take some more pics when I get there .. Hope everyone is doing good on there projects and feel free to write some comments , thanks , lively

  10. #140
    Join Date
    Feb 2009
    Location
    Edmond, OK
    Posts
    2,508

    Default

    Making some good progress!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •