So it has been a long time since I have added anything to this thread, with all the craziness from Covid-19 to just life being busy I have forgotten to update. With all the lock downs the wife and I did not have much else to do so we spent a lot of time working on the rebuild, and surprisingly finished almost on time. Our goal was to be on the water by Memorial day, but because of the weather we were delayed by about a week. The only thing we have not finished up is the rear seat as we want to improve on the original design and make it more ski friendly by being removable. So as of now we are skiing and using the boat like normal just without a rear seat and an exposed gas tank. Overall we are extremely happy with how it has turned out! The only issue we had was that the floor ended up being about 1/4" higher in the rear than originally so we had to cut the bottom out of the rear compartment because the gas tank fittings were preventing the cap from sitting all the way back down. I'll add some of the pictures of the process.