Another progress report. I've spent more time than I anticipated finishing a lot of small projects. I adjusted the removable floor sections, cleaned several rats nests of wires around the engine, installed the bilge pump and float switch, installed a new thermostat, temp sending unit, new water separating filter, new hoses and clamps, painted rear vents, buffed interior gel coat and patched holes from old bimini hardware. I've got to sand the gelcoat patches and do a little more buffing and I think I'll be ready to install carpet. I'm hoping to have some time over the holiday break to hit it hard. We'll see what takes precedence, my boat project or the wife's to-do list.
![]()