Stringers rapped with fiberglass mat
Installed closed cell foam and started the deck
New deck is fitted had to use 3/4'' 5/8 '' is nowhere to be found . 140.00 per sheet Lets Go Brandon. Test fit the upper hull before glassing in the floor . Fit is good but top cap will need to come back off to finish the floor. Got carpet going with navy blue instead of the black that was there should be ready for interior next week.
Dragged it back into the basement workshop took the cap back off to finish the glass on the floor and install the foot well . I had to put the cap back on because the floor was so hacked and rotted I couldn't get patterns and locations were lost. Floor is in and glassed in. Looking good for the end of the month . Retirement is a good thing.
Deck is done time for carpet I went with navy blue to go with the blue on the hull .
Do you buy the marine carpet in north GA? Did not know if they offered better pricing over there.
2018 Supra SL400