Quote Originally Posted by Jetlink View Post
This topic invariably comes up at least once a year at the end of the season. The Comp takes all of five to seven minutes to drain if you lay out all the tools and go like hell and hope that you do not miss anything. Mr. Hunter's timeline is a better one to gauge off of though as I use the time to go over the entire engine and transmission to just check for anything that might need attention due to another season of "minimal" use.
It takes me 15 min. just to find all my tools. Mr. Hunter probably keeps a Swiss army knife in his shorts when he skis for such occasion.
Unfortunately, I have to remove ballast bags first to get to motor access. Then contort my body while laying in the fetal position in rear lockers while I say a few choice words and ponder why I don't just connect my bucket and fill her up with antifreeze like I did my Rider for so many years to much success.


Quote Originally Posted by 87TSComp View Post
The boat was completely repainted, the bottom color is a very dark blue, synergy green and metallic silver.. all GM colors , supra graphics are paint as well..
Thanks for posting pics. Very nice job on this boat. It is very inspiring to see someone with a vision and carry it out to such perfection. I like it!!!

Just don't crack the block or this forum will be relentless.