Before poking holes, I would be inclined to use temporary wires hooked to the switch, (so run the wire over the stern), put the lights where you think you want them and see the result in the water you use. Then you would be able to gauge their effectiveness and location. (Move 2 to one spot, spread them out more, etc) All with 2 lights at the time, then determine if you want more or less.